Zibb

Feature

Align up: The case of the out-of-sync synchro amps

Tales From The Cube: An Apollo-program engineers struggles to straighten out a system that suffers from repeated misalignment of antenna synchro amplifiers.

By Arnold N Simonsen, Electrical Engineer -- EDN, 11/13/2008

A previously published Tales from the Cube column (Reference 1) brought to memory a similar experience I had with a relay-release time and an attempt to reduce inductive spikes.

As a young engineer in the late ’60s, I was working on the Apollo instrumentation ships, which NASA used to track and communicate with the Apollo lunar-excursion module. The ships had C- and S-band radars, a satellite-com antenna, a telemetry-tracking antenna, a VHF/UHF command-and-control communication antenna, and a large data-processing center. Each of the antennas provided azimuth- and elevation-position-synchro data to a central network.

This network allowed selection of any antenna’s position data for making one antenna act as a slave to another antenna. Large synchro amplifiers drove 23 small synchro amps to amplify the synchro-position data. The 120V, 60-Hz synchro amps required an electromechanical-alignment procedure. The amps could align to approximately 0.1°.

After successful system tests, we noticed that the amplifiers were out of alignment by large amounts—in many cases, 20° or more. Realignments were tedious and time-consuming. We resorted to pinning the shafts to keep them aligned, thinking it was a mechanical problem. Over time, the pins became loose and even bent, however.

The three-wire outputs of the synchros went into a relay-switch network. The relays allowed selection of which antenna would act as a slave. The relay coils each had suppression diodes to reduce inductive spikes, the noise on control lines, and switch-contact arcing. This procedure was standard and accepted.

While monitoring the switching transients, I saw that the relays’ dropout time was a lot longer than their pull-in time. This excess time allowed the outputs of two or more synchro amps to connect across each other during the dropout time of the relay. During switching, the amplifiers also made loud gear noises. This pull-in- and dropout-time difference was new to me, but checking relay characteristics confirmed my observation. Some studying of the use of suppression diodes indicated that diodes would even lengthen the relays’ dropout time. I tried capacitors and RC networks to no avail.

Read more
Tales from the Cube

Then, in a diode catalog, I found a Thyrector device from General Electric. It was basically two back-to-back diodes for reducing inductive spikes. I tried using the device to correct the time difference, and it greatly reduced the relays’ dropout time.

My boss was reluctant to make any change because the customer had accepted the system. We had no recording scopes back then, so I set up a fast strip-chart recorder to monitor the relay pull-in and dropout times during typical switching sequences and showed him the two connected amplifier outputs. I repeated the test with the Thyrectors in the circuit, which showed a great reduction of the overlap time and no gear noises during switching. Success!

I replaced the suppression diodes with Thyrectors, and subsequent tests during sea trials showed no synchro-amp misalignments.

Arnold N Simonsen is an electrical engineer in Tucson, AZ. Like Arnie, you can share your Tales from the Cube and receive $200. Contact edn.editor@reedbusiness.com.


Reference
  1. Lindenbach, Walter, “Time bomb,” EDN, Sept 27, 2007, pg 26.


Reed Business Information Resource Center

Featured Company


Related Resources

ADVERTISEMENT

ADVERTISEMENT

Feedback Loop


Post a CommentPost a Comment

Related Content

 

By This Author

There are no additional articles written by this author.


ADVERTISEMENT

Knowledge Center


Events

Microchip Worldwide Embedded Designer’s Forum
Dates: 10/6/2009 - 2/15/2010
Location: 120 Locations Worldwide

FPGACamp - Debugging Your FPGA on 11th Nov. 2009 in Silicon Valley
Dates: 11/11/2009 - 11/11/2009
Location: Santa Clara, CA

Heatsink 101 - Everything You Ever Wanted To Know
Dates: 11/18/2009 - 11/18/2009
Location: On-line

eXample Consulting Group's SIX SIGMA GREEN BELT training program
Dates: 11/20/2009 - 11/22/2009
Location: Newl Delhi, India

eXample Consulting Group's SIX SIGMA GREEN BELT training program
Dates: 11/27/2009 - 11/29/2009
Location: Bangalore, India

Submit an EventSubmit an Event




Technology Quick Links

EDN Marketplace


©1997-2009 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy

Please visit these other Reed Business sites